Construction of the 20 MW / 40 MWh Molėtai Battery Energy Storage System (BESS)
Construction of the 20 MW / 40 MWh Molėtai Battery Energy Storage System (BESS) Construction of the Molėtai Battery Energy Storage System (BESS), including equipment installation and commissioning works. Commissioning of the BESS and hybrid controller.
View details




