Construction of the 30 MW / 60 MWh Jonava Battery Energy Storage System (BESS)
Supply and construction of the 30 MW / 60 MWh Battery Energy Storage System (BESS), including construction of the new 30/110 kV manufacturer-supplied section, and reconstruction of the existing 110 kV Dargužiai Transformer Substation (TP) in compliance with AB Litgrid connection conditions. Commissioning of the BESS park controller and performance of grid tests.