Reconstruction of a 110/35/10 kV Kuršėnai, TS Reconstruction of a 35/10 kV Ramučiai, TS Reconstruction of a 35/10 kV Užventis TS
Reconstruction of a 110/35/10 kV Kuršėnai TS, 35/10 kV Ramučiai TS and 35/10 kV Užventis TS, installation of a 35 kV cable line and connection of two 4.5 MW wind power plants to the ESO network in Kelmė Region.