
Construction of a 330 kV Dvarviečiai wind power plant TS – Tytuvėnai wind power plant TS
Similar projects


Construction of the 25 MW / 50 MWh Anykščiai Battery Energy Storage System (BESS)

Construction of the 30 MW / 60 MWh Jonava Battery Energy Storage System (BESS)

Construction of the 30 MW / 60 MWh Anykščiai Battery Energy Storage System (BESS)

Installation of the 60 MW / 120 MWh battery equipment for the Vilnius Battery Energy Storage System (BESS)






