Construction of the 30/110 kV Girininkai

Construction of the 30/110 kV Girininkai Substation with a 110 kV cable line for the connection of a new wind farm Design, equipment supply and installation of a new 30/110 kV substation with a new 110 kV cable line, as well as reconstruction of the existing 110 kV overhead line (Litgrid).

View details
110/30kV Pilialaukio TP

110/30kV Pilialaukio TP The first commercial battery storage park, with a capacity of 60 MW and 120 MWh, is currently under construction near Stary Trakai. The project will include the installation of eight battery storage units equipped with AC/DC converters. These units will be connected through the newly constructed 110/30 kV Pilialaukis substation to the…

View details
33/330 kV Pieliai wind power plant TS

33/330 kV Pieliai wind power plant TS New construction, design and equipment supply of engineering networks (power grid) at a 33/330 kV Pielių wind power plant TS at Medinių Village, Degaičiai Eldership, Telšiai Municipality. Transmission network operator (Litgrid) 330 kV switchyard with 4 bays, 33/33/330 kV power transformer, 33 kV distribution network with 33 kV…

View details